Client:  B&Q

Project:  Boiler, Pumps & Controls Rollout

Location: 360 Stores Nationwide

Duration: 6 weeks

Design:
B&Q asked us to design  displays for both Boilers and pumps & controls, 3d visuals and 2d cad drawings were produced prior to the proto types going into production.

Project Scope:
Design prototypes to be installed at B&Q head office for sign off. Once sign off had been achieved the manufacture & installation  was carried out on nights causing minimum disruption to the stores.

Summary:
All works were carried out on time, on budget and  no snagging, call backs or remedials.