Client: B&Q
Project: Boiler, Pumps & Controls Rollout
Location: 360 Stores Nationwide
Duration: 6 weeks
Design:
B&Q asked us to design displays for both Boilers and pumps & controls, 3d visuals and 2d cad drawings were produced prior to the proto types going into production.
Project Scope:
Design prototypes to be installed at B&Q head office for sign off. Once sign off had been achieved the manufacture & installation was carried out on nights causing minimum disruption to the stores.
Summary:
All works were carried out on time, on budget and no snagging, call backs or remedials.